EMTiming Project Picture Gallery



CDF EMTiming Project Layout

project layout project layout project layout


Events and Timing Information


HADTDC Timing and Inefficiency, GMSB emtiming, zgamma events



Run II Preliminary HADTDC Timing HADTDC Inefficiency Kinematics gmsb k=0.1 gmsb k=0.8 zgamma events gmsb emtiming HADTDC vs EMTiming limits predicted cosmic rays and produced events

Expected Events with Timing Information



expected events from zgamma production with timing information expected events from GMSB SUSY production with timing information expected events from large extra dimensions with timing information expected events from SUSY GGgamma production with timing information

Splitter Pictures and Results


Scope Pictures and Splitter Response on Test Stand, Timing Resolution, ADMEM Results, LED Results



Scope Pictures with 1 Volt Input Scope Pictures with 150 mV Input Secondary Splitter Response as a function of input voltage ADMEM Test Stand Results:Pedestals 10 GeV Blowup: Bucket 1 10 GeV Input:4 Buckets 40 GeV Comparison 40 GeV Comparison with no 50 Ohm termination on the secondary output Black and White Picture of Splitter Color Picture of Splitter New Splitter Diagram Measurement of Intrinsic Timing Resolution of Splitter secondary noise in splitter led comparison results with ADC counts led pedistal results with ADC counts
Maintained by Peter Wagner (wagnp@fnal.gov)
Last Updated - 12/06/03